New Komatsu P&H 4100 XPC-AC Shovel Assembly

Client: Komatsu Australia

Duration: 7 months day shift only including Planning Phase

 

Wisely was tasked to partner with the OEM Komatsu Australia for the full supply of labour to undertake the first new P&H 4100 XPC-AC Electric Rope Shovel assembly in 6 years on the east coast of Australia.

This new machine assembly had a larger than normal electrical scope with all electrical specifications meeting Australian standards including the changing of imperial to metric wire sizing and specific electrical requirements to meet the customer’s needs. This work normally completed off site was done in parallel to the machine construction.

The Shovel is fitted with the largest dipper on the market at 86yard (63m3) to be engaged in overburden removal paired with Komatsu 930E trucks.

Wisely delivered all execution services for this build including, structural welding, full electrical wiring scope, paint and blast, fitting, scheduling and OHS management. The build was completed with more than 16,000 Wisely man hours recordable injury free. The success of this build galvanises our long-lasting relationship with Komatsu Australia and demonstrates what is achievable, a quality new machine assembly and the safe delivery of a world class asset for the customer.

SHE 41 Ready to walk off the erection pad for final commissioning
SHE 41 Ready to walk off the erection pad for final commissioning
Fitting the frozen Centre Pin to the Carbody
Fitting the frozen Centre Pin to the Carbody
Structural Welding of Towing Lug to the Carbody
Structural Welding of Towing Lug to the Carbody
Structural welding of stiffener plates to Carbody
Structural welding of stiffener plates to Carbody
Welding of revolving frame wing with welding buggy
Welding of revolving frame wing with welding buggy
Welding of wing section to revolving frame
Machine with Revolving frame fitted to Carbody wings & ballast box fitted lube room installed
Machine with Revolving frame fitted to Carbody wings & ballast box fitted lube room installed
Fitting out of Boom installation of Crowd equipment & walkways and handrail
Fitting out of Boom installation of Crowd equipment & walkways and handrail
Installation of electrical cables to switchboards to Australian standards being installed on site
Installation of electrical cables to switchboards to Australian standards being installed on site
Starting to terminate cables in switchboards
Starting to terminate cables in switchboards
Boom raised and machine final fitout & the commissioning process underway.
Boom raised and machine final fitout & the commissioning process underway.